Courtyard by Marriott

Greater Los Angeles, CA Area, Completed in Q2 2014


Guestrooms & Corridors Included:

Demo, Wall Preparation (vinyl wall covering), Vinyl Wall Covering Installation, Painting (doors, window valance), Carpet Installation (Both double stick & stretch), Electrical (Corridor wall sconces), FF&E Installation, Signage Package Install and On-Site Construction Management.

Public Space Included: (Bar Bistro/Cafe, Lounge/Business Center, Lobby/Front Desk, Meetings rooms, Ballroom, Pre-function, Boardroom)

Demo including removal of (walls, ceilings, flooring, existing bar), Concrete floor cutting, removal & re-pour for new plumbing & electrical, Framing (suspended ceiling, wall framing etc.), Drywall Installation & Wall Preparation, ACT & grid installation, Painting (walls, ceilings & trim), Vinyl Wall Covering Installation, Flooring Installation (tile w/ epoxy grout, double stick carpet), Wall tile Installation (epoxy grout @ bar backsplash), Partition Wall Covering Installation (Ballroom) and FF&E Installation.

Need help with hotel renovation?

GET IN TOUCH

© COPYRIGHT HotelRehabs

Website Design by Contractor Gorilla