Courtyard by Marriott

Ventura County, CA, Completed in 2012


Public Space Included: (Lobby, Bar, Front Desk/Market, Public Restrooms, Meeting rooms/Boardroom)

Demo including removal of (walls, ceilings, flooring, bar, front desk), Concrete floor cutting, removal & re-pour for new plumbing & electrical, Framing (ceiling & wall framing), Millwork (install new wood trim, doors & frames), Drywall Installation & Wall Preparation, ACT & grid installation & repair, Painting (walls, ceilings & trim), Vinyl Wall Covering Installation (including specialized wall murals), Flooring installation throughout (tile w/ epoxy grout, double stick carpet), Wall Tile Installation (epoxy grout @ bar backsplash), FF&E Installation and On-Site Construction Management.