Sheraton by Starwood

Hartford, CT Area, Completed in Q2 2013


Guestrooms & Corridors Included:

Demo, Wall & ceiling drywall preparation, Vinyl Wall Covering Installation, Painting (exterior walls, ceilings, doors/jambs, vanity facia), Carpet Installation (Both stretch & single stick glue down), Install millwork vinyl base (Johnsonite), Install closet doors, Electrical (wall sconces corridor), FF&E Installation and On-Site Construction Management.

Public Space Included: (Lobby, Bar/Lounge/Library, Restaurant, Public Restrooms, Club Room, Fitness, Pool Area)

Demo including removal of (walls, ceilings, flooring, existing bar, front desk), Concrete removal & re-pour for new plumbing & electrical, Framing (ceiling, suspended ceiling, wall framing), Drywall Installation & Wall Preparation, Install doors & frames, Painting (walls, ceilings & trim), Vinyl Wall Covering Installation, Flooring installation (double stick carpet), Floor & wall tile installation (Club Room) and FF&E Installation.

Need help with hotel renovation?

GET IN TOUCH

© COPYRIGHT HotelRehabs

Website Design by Contractor Gorilla